Do not allow tracking time to tasks which level is equal or lower than

183 views 20 March 2018 0

“Do not allow tracking time to tasks which level is equal or lower than” option can be found in the time tracking settings

It allows you to forbid to report time on certain Project/task levels

Example: Once you set the option value to “1”. It will forbid to report on all the Level 1 Projects, as shown below:

Once you try to enter time for this level task, the error message will appear: