TimeCamp vs Timely (2026): Which AI Time Tracker Wins?

  • Wojciech Piwowarski
  • July 16, 2026
  • 15 min read
post image
Contents hide

Pondering over TimeCamp vs Timely to know how much billable work goes unrecorded when a team reconstructs the day from memory? Timely Memory records background activity on a private timeline, and AutoSheet turns that context into draft entries for review. TimeCamp approaches the same problem through two tracking methods and connects the resulting data with budgets, invoicing, attendance, time off, and approvals.

How do we review software in TimeCamp?

A human is behind every word posted here. We value our users’ time and trust, so you can be sure our team (Ola, Wojtek, Kasia, Iza, Robert, and others) spent real hours testing the apps, and then researching, briefing, and writing this article.

Our editorial team has 10+ years of experience writing SaaS content, including testing and using a variety of tools daily. Our writers are also app users, so we write our recommendations based on what we would read as potential clients. Our main rule is “do not cover without a source.”We also revisit and update our articles to cover notable changes to the app’s features or pricing (at least quarterly).

Read more → How do we create content and review software in TimeCamp?

Happy reading! 

 

For agencies, consultancies, IT firms, remote teams, and other service organizations, the choice depends on what happens after hours are captured. Some teams prioritize passive timesheets and capacity planning. Others need the same data for billing, labor costs, accounting, and workforce administration.

→ For a separate product overview, see What is Timely?

Pricing, profitability, integrations, security, and AI costs all influence the final choice, and neither platform serves every workflow equally well.

Key Takeaways: 

  • Both products reduce manual entry, but their review and assignment workflows differ.

  • Memory and AutoSheet give Timely a cohesive passive-capture experience.

  • TimeCamp offers keyword-based assignment and pattern-based AI suggestions as separate methods.

  • TimeCamp has a free plan without user or project caps; Timely limits selected plans.

  • Timely provides dedicated capacity planning, while TimeCamp connects time data with more billing and workforce processes.

  • Base subscriptions cost less in TimeCamp, although AI suggestions add variable token usage.

  • Both platforms are GDPR-compliant and ISO 27001-certified; their deployment options differ.

 

Quick verdict: 

Choose Timely for passive timesheets that require little daily input and for dedicated capacity planning.

Choose TimeCamp when tracked hours must also support billing, attendance, time off, labor costs, approvals, and Xero. Compare the required plans and expected AI usage before judging price.

How do TimeCamp and Timely compare at a glance?

Timely concentrates on passive timesheets and resource planning. TimeCamp combines automatic time tracking software with billing, attendance, costs, and approvals.

Note: Our team has tested Timely to provide an accurate product description, screenshots, and comparison with TimeCamp features.

TimeCamp: ⭐ 4.7/5

Timely: ⭐ 4.5/5

The table below compares how each platform works once testing turns into daily use.

Criteria

TimeCamp

Timely

Best for

Billing, attendance, costs, and approvals

Passive timesheets and capacity planning

Free option

Free; unlimited users and projects

14-day trial

Starting price with annual billing

$3.99/user/month

$9/user/month

Automatic tracking

Standard Desktop App + AI Time Tracker

Memory + AutoSheet

Profitability and budgets

Budgets, rates, labor costs, profitability

Budgets, rates, cost, profit

Invoicing and accounting

Invoicing, QuickBooks Online, Xero

Invoicing, QuickBooks Online

Attendance and time off

Dedicated workflow

Overtime, undertime, administrative projects

Timesheet review

Submit, approve, reject, lock

Configurable entry states

Capacity planning

Resource Planner: Premium+

Planning: Premium; capacity reports: Unlimited

User/project caps

None

Starter: 5 users/20 projects; Premium: 50 users

Desktop support

Windows, macOS, Linux for Standard App

Windows and macOS for Memory

Mobile support

iOS, Android

iOS, Android

What is the real difference between TimeCamp and Timely?

Passive capture sits at the center of Timely, alongside timesheets, budgets, and resource planning. TimeCamp extends automatic tracking into invoicing, attendance, time off, labor costs, accounting, and formal approvals.

How does each tool capture time automatically?

Timely Memory, the platform’s background activity-capture app, records websites, applications, documents, and meetings on a private timeline. AutoSheet uses this context to prepare draft time entries for the user to review.

TimeCamp uses two forms of automatic time tracking. The Standard Desktop App assigns activity through project keywords, while the AI Time Tracker prepares suggestions from recurring patterns, calendar events, previous entries, and corrections.

What happens after time is captured?

Both platforms convert captured activity into time tracking data used across timesheets, budgets, rates, and profitability reports.

In TimeCamp, recorded hours can also feed project budgeting and profitability, invoicing and billing, labor costs, accounting, attendance, time off, Resource Planner, and approvals.

How much setup and cost does each tool require?

Timely Memory requires little daily input once it starts collecting activity, although clients, projects, rates, budgets, and planning data still need configuration.

Using TimeCamp’s full reporting workflow requires more account-level setup. Projects, keyword rules, rates, integrations, attendance settings, and approval paths determine how recorded hours move through the account.

TimeCamp pricing plans start below Timely’s subscriptions. AI suggestions use separately billed tokens, while Timely applies user and project caps to lower tiers. Team size, plan requirements, and AI usage determine the actual monthly cost.

TimeCamp vs Timely feature comparison

Timely leads in passive capture and specialized capacity planning. TimeCamp covers more billing, workforce, accounting, and approval processes around each timesheet.

Requirement

Stronger option

Reason

Passive capture

Timely

Unified Memory-to-AutoSheet workflow

Tracking flexibility

TimeCamp

Rule-based and AI-assisted project tracking methods

Profitability workflow

TimeCamp

Budgets, labor costs, expenses, billing

Accounting

TimeCamp

QuickBooks Online plus Xero

Attendance and time off

TimeCamp

Dedicated workflow

Timesheet approvals

TimeCamp

Submission, review, rejection, locking

Capacity planning

Timely

Specialized planning and reporting

Integration breadth

TimeCamp

Native connections across more software categories

Desktop OS coverage

TimeCamp

Linux support in Standard Desktop App

Do TimeCamp and Timely track time without timers?

Yes and that’s how they do it: 

  • Timely Memory records background activity, and AutoSheet turns it into suggested entries.
  • TimeCamp assigns activity through keyword rules or prepares pattern-based AI suggestions.

Mobile apps do not reproduce the full desktop capture process, but they remain useful for timers, manual entries, location tracking, and reviewing existing records.

Is TimeCamp’s AI Time Tracker a practical Memory alternative?

Yes, but it is not a direct replica. Timely combines Memory and AutoSheet in a mature, low-setup workflow built around a private timeline.

a screenshot of memory tracker by timely

Memory tracker works in the background and completes your timesheets.

TimeCamp separates predictable work from changing context: keyword rules within the Standard Desktop App suit recurring assignments, while AI suggestions in AI Time Tracker cover research, communication, meetings, and frequent task switching. Activity, time entries, notes, and tags stay in a local database on the user’s computer, and syncing them to a server is optional, especially since using AI Time Tracker doesn’t require signing up for TimeCamp.

a screenshot of AI time tracker by TimeCamp

TimeCamp AI Time Tracker captures time and activity in the background and prepares accurate suggests to fill your timesheet without timers.

When AI suggestions are enabled, the AI app sends the context required for entry classification to an external model provider. On-device processing keeps the suggestions private until the user adds them to the web timesheet (unless the user has already signed up to TimeCamp). 

How about AI providers in both tools? 

The provider in AI Time Tracker by TimeCamp is a separate setting. Users pick the model in the desktop app or connect their own OpenRouter key; they can also turn off AI suggestions entirely. Connecting the user’s own model via OpenRouter doesn’t consume tokens purchased in TimeCamp, making AI Time Tracker usage basically free. 

Timely takes the opposite approach: Memory uploads activity to a private timeline inside Timely. AI in Timely is not an optional layer. 

Timely offers the more polished, low-setup capture experience.

TimeCamp becomes more relevant when teams need different assignment methods and want the resulting entries to feed billing, attendance, approvals, and cost reporting.

Which tool provides more useful project budgeting and profitability data?

Timely supports time and money budgets, cost and billable rates, recurring budgets, revenue, profit, profitability views, and productivity insights across clients and projects.

a screenshot of people report in Timely

Timely’s People dashboard shows the number of hours a person logged per week.

TimeCamp adds estimates, fixed-fee projects, labor costs, expenses, and billing rates. Its advantage lies in keeping those inputs close to invoicing, approvals, attendance, and operational reporting.

a screenshot of project margin report in timecamp

TimeCamp helps you compare total revenue and total cost of a project.

How do invoicing and accounting integrations compare?

Both products create invoices from recorded work and connect with QuickBooks Online.

Timely makes the integration available on Premium and Unlimited.

TimeCamp offers invoicing from Starter. Premium plan allows one integration (including Xero), and Ultimate adds unlimited integrations, expenses, labor costs, and billing rates. Its accounting edge lies in native Xero support and the ability to keep expenses, labor costs, and billing rates in the same workflow.

invoicing wizard in timecamp

TimeCamp creates invoices based on time entries logged for specific tasks and assigned billing rates.

Which tool handles attendance, time off, and approvals?

TimeCamp Starter covers attendance records, overtime, time off, and leave management. Ultimate adds a dedicated approval sequence with submission, review, rejection, and entry locking.

a collage of attendance features in timecamp

TimeCamp covers attendance, time off, leave management, and basic resource planning, as well as clock-ins via Kiosk.

Timely handles overtime and undertime through reporting, records absences against administrative projects, and supports approval-style processes through configurable entry states. Those tools remain distributed across planning, reports, and project setup.

TimeCamp keeps attendance, leave requests, payroll preparation, and formal approvals in one workflow.

Timely covers the component parts through separate planning, reporting, and project-management functions.

Which platform provides better capacity planning?

Timely combines team planning on Premium with capacity management and reporting on Unlimited. Managers can schedule work, define weekly capacity, and compare planned hours with actual time.

Resource Planner connects resource allocation data with budgets, estimates, attendance, and project costs. Timely offers a more specialized planning interface. TimeCamp keeps resource decisions closer to financial and workforce data.

a screenshot of resource planning feature in TimeCamp

Resource Planner is a native TimeCamp feature that helps you see team availability, balance workloads, and confidently assign people to projects.

Timely provides dedicated capacity planning and reporting.

TimeCamp becomes more relevant when staffing decisions must also reflect attendance, labor costs, project budgets, and billing data.

Which tool integrates with more of your stack?

Integration labels need context:

  • two-way sync,
  • browser timers,
  • Zapier workflows,
  • passive app detection

They simply do not exchange the same data.

Timely offers advanced synchronization with selected tools such as Asana, Jira, ClickUp, Trello, and Linear. Other apps mainly provide contextual data for Memory.

a screenshot of the hero section of integrations directory in Timely

Timely’s integrations directory, June 2026.

TimeCamp integrations span project management, development, CRM, help desk, calendars, and accounting, including Asana, Jira, ClickUp, Trello, GitHub, QuickBooks Online, Xero, and Salesforce.

TimeCamp’s web-based time tracking provides a shared project workspace for reviewing the time records collected across a team’s workflow.

a screenshot of integrations directory in  TimeCamp

TimeCamp’s integrations directory, June 2026.

Quick tip: TimeCamp connects natively with more categories of business software. Timely concentrates its most advanced synchronization features on a smaller group of services.

Which desktop and mobile apps are supported?

TimeCamp is available via:

  • a web app,
  • the Standard Desktop App (with Computer Activities) supports Windows, macOS, and Linux
  • AI Time Tracker is available for Windows and macOS
  • mobile apps for iOS and Android.

Timely provides web access and mobile apps for iOS and Android. Memory runs on Windows and macOS, and Linux users can access Timely through the browser. 

How much do TimeCamp and Timely cost?

TimeCamp has lower base prices, but team size, plan limits, and token-based AI usage affect the real comparison.

Rates below are per user, billed monthly, with annual billing.

Plan level

TimeCamp

Timely

Free option

Free: $0

No free plan; 14-day trial

Entry paid plan

Starter: $3.99

Starter: $9

Mid-tier plan

Premium: $6.99

Premium: $16

Higher standard plan

Ultimate: $9.99

Unlimited: $22

Enterprise

Custom pricing

Custom pricing

 

TimeCamp’s AI Time Tracker usage is billed separately, with typical costs of about $6 per user per month depending on token consumption.

What does each plan unlock?

Feature availability matters because similarly named plans unlock different workflows.

Requirement

TimeCamp availability

Timely availability

Attendance

Starter+

Overtime/undertime on Unlimited

Time off

Starter+

No dedicated request workflow

Project budgets

Premium+

Basic budgets; recurring budgets and cost tools on Premium+

Billable time

Premium+

Starter+

Invoicing

Starter+

Premium+

Approvals

Ultimate+

Entry states on Premium+

Billing rates

Ultimate+

Paid plans

Expenses

Ultimate+

No native expense module

Integrations

1 on Premium; unlimited on Ultimate

Sync and accounting tools on Premium+

Capacity planning

Resource Planner on Premium+

Planning on Premium; reports on Unlimited

AI suggestions

All plans; token-based

Included in paid plans

User/project caps

None

Starter: 5/20; Premium: 50/unlimited

What does each team size actually pay?

How much does a five-person team pay? 

  • TimeCamp Free is $0 for five users (with unlimited projects included) and should be entirely sufficient for a five-person team. However, if their workflow requires unlocking Invoicing or Attendance features, the TimeCamp Starter plan costs them only $19.95 per month.
  • Timely Starter costs $45 per month and reaches its five-user and 20-project limits.

What does a ten-person team using AI suggestions pay?

  • Ten users can use TimeCamp Free (0$) or Starter ($39.90 per month), with estimated AI token usage adding about $60 per month, which is $99.90 per month.
  • Timely requires Premium at $160 per month because Starter cannot accommodate the team.

What does a twenty-person billing-driven team pay?

  • A 20-person team needing approvals, labor costs, expenses, billing rates, and unrestricted integrations pays $199.80 for TimeCamp Ultimate. Estimated AI usage raises the total to $319.80.
  • Timely Premium costs $320 for 20 users and includes budgets, cost management, accounting integration, and team planning, but not an equivalent attendance, leave, expense, or formal approval workflow.

Adding AI-assisted tracking narrows the base-price advantage. Teams using rule-based capture continue to pay the lower base subscription cost.

See how top teams track profitability

Book a short, focused call to see TimeCamp configured for your organization’s structure, approval flows, and reporting needs.

banner
Why schedule a demo?
  • icon

    Get a guided product walkthrough
    and a tailored offer

  • icon

    Get your questions answered 

    in real-time

  • icon

    Check how we sync with your
    current tech stack

Joined by 18,000+ teams worldwide

iconiconiconiconiconicon
banner
iconicon

Is TimeCamp a good Timely alternative?

TimeCamp is a credible alternative to Timely when tracked hours must feed accounting, attendance, approvals, labor costs, and client billing. Xero, formal approvals, and uncapped workspaces strengthen its case. Timely remains attractive when passive capture and capacity planning take priority.

What are Timely’s strengths and trade-offs?

Timely minimizes daily input, but higher prices, plan limits, and the use of administrative projects for leave define the main trade-offs.

Strengths

Trade-offs

Private Memory timeline

Higher base price

AutoSheet drafts entries

Starter caps users and projects

Low reliance on manual timers

No native Xero integration

Dedicated capacity tools

Leave handled through administrative projects

No screenshots or keystroke logging

Tasks costs extra

Users review entries before sharing

Advanced capacity reports require Unlimited

What are TimeCamp’s strengths and trade-offs?

TimeCamp connects timesheets with billing, workforce administration, and project-cost reporting, but reliable reports depend on accurate project, rate, rule, and approval setup.

Strengths

Trade-offs

Rule-based and AI-assisted tracking

More setup across projects and workflows

Budgets, labor costs, expenses, billing

Variable AI token cost

QuickBooks Online and Xero

Some financial tools require Ultimate

Attendance, time off, approvals

Less specialized capacity planning

Linux Standard Desktop App

AI Time Tracker: Windows and macOS

No user or project caps

Suggested entries still require review

TimeCamp or Timely: which fits your workflow scenario?

Timely favors a focused capture-and-planning workflow. TimeCamp suits teams that move the same hours through billing and workforce administration.

Scenario A: which tool fits passive timesheets and capacity planning?

Memory, AutoSheet, and planned work form a continuous path in Timely. TimeCamp reaches similar stages through separate tracking, budgeting, and Resource Planner tools.

Requirement

Timely

TimeCamp

Passive capture

Memory

Standard App + AI Tracker

Setup

Low daily input

More project and workflow setup

Timesheet preparation

AutoSheet

AI suggestions and keyword rules

Team planning

Planned work and schedules

Resource Planner

Capacity reporting

Premium planning; Unlimited reports

Allocation with budgets and estimates

User caps

5 on Starter; 50 on Premium

None

 

Choose Timely when low setup and dedicated capacity reporting matter more than attendance, accounting breadth, or formal approvals.

Scenario B: which tool fits billing, margins, attendance, and approvals?

For billing-driven service teams, the surrounding approval, accounting, attendance, and payroll processes matter more than the capture interface alone.

Requirement

Timely

TimeCamp

Profitability

Budgets, cost, revenue, profit

Budgets, labor costs, expenses, margin

Invoicing

Premium+

Starter+

QuickBooks Online

Native, Premium+

Native

Xero

No native Xero integration

Native

Attendance and leave

Reports and administrative projects

Dedicated workflow

Approvals

Configurable entry states

Submission, review, rejection, locking

Labor costs

Cost rates and profitability reports

Project and payroll reporting

User/project caps

Starter and Premium limits

None

Linux capture

Memory: Windows and macOS

Standard Desktop App

 

Choose TimeCamp when one record must support client billing, Xero, leave requests, payroll preparation, and manager approval.

Does Scenario B fit your team?

Billable hours, margins per project, attendance, and approvals in one record. Bring together one client and one month of work, and check the numbers yourself.

Are TimeCamp and Timely GDPR compliant?

Both platforms are GDPR-compliant and ISO 27001-certified. The practical differences lie in deployment control, data residency, customer-facing access controls, and screenshot policies.

Governance area

TimeCamp

Timely

GDPR

Compliant; deletion and portability rights

Compliant; access, download, deletion, DPA

ISO 27001

 ISOCERT for ISO27001

ISO 27001:2022

SOC 2

SOC reports cover the underlying AWS infrastructure

SOC reports cover the underlying AWS infrastructure

Hosting

AWS; self-host/private cloud available

EU-based AWS

Data residency

Customer-selected AWS region on dedicated deployment

EU region

Encryption at rest

AWS RDS and encrypted backups

AES-256

Encryption in transit

TLS

TLS 1.2+

Data control

Deletion, portability, deployment choice

Memory download/deletion; no ad use

SSO/SAML

SSO login on Ultimate and Enterprise

Enterprise SAML via Okta/Azure AD

MFA/2FA

2-factor authentication is available on the Free plan and all paid plans

Mandatory MFA protects Timely’s administrative access

Screenshots

Optional; off by default

Absent by design

 

TimeCamp offers dedicated AWS regions (US and EU), private-cloud deployment, self-hosting, and an Enterprise audit trail. Timely keeps standard SaaS data in EU-based AWS infrastructure and uses AES-256 encryption at rest with TLS 1.2+ in transit.

Neither platform has an independent SOC 2 certification. Both tools’ SOC2 reports cover the underlying AWS infrastructure. TimeCamp is certified to ISO 27001.

Does switching to TimeCamp require screenshots or employee monitoring?

No. TimeCamp does not require screenshots for productivity monitoring, timesheets, budgets, invoicing, attendance, labor costs, or approvals.

Timely omits screenshots, keystroke recording, and audio capture by design. Memory records activity metadata on a private timeline that remains with the user until entries are shared.

TimeCamp makes screenshots configurable; Timely excludes them from the product.

What do TimeCamp and Timely users say?

Timely users often praise the platform for reducing the effort required to reconstruct a working day, although passive capture still needs review when tasks change quickly or work moves away from the screen. TimeCamp receives positive feedback for billing and integrations, but some users report a steeper learning curve when configuring features and managing timesheets.

What do Timely users say on G2?

We switch tasks frequently, which can make it challenging to keep track of all the work we do.

Tricia F., Co-Founder
Small business with 50 or fewer employees
Rating: 5/5
Review date: February 20, 2026
G2 status: Current User, Validated Reviewer, incentivized review

 

(…) it can feel too passive and rigid.

Stacy Makau S., Financial Analyst
Small business with 50 or fewer employees
Rating: 5/5
Review date: February 2, 2026
G2 status: Current User, Validated Reviewer, incentivized review

What do TimeCamp users say on G2?

(…) it syncs with Monday.com so that our data always matches.

Heidi W., Chief Operations Officer
Small business with 50 or fewer employees
Rating: 4/5
Review date: May 6, 2025
G2 status: Current User, Validated Reviewer, organic review

 

Complexity in understanding the features and the editing and managing timesheet.

Dhruv B., Founder
Information technology and services
Small business with 50 or fewer employees
Rating: 2.5/5
Review date: June 5, 2025
G2 status: Current User, Validated Reviewer, organic review

How do you make the final call between Timely and TimeCamp?

Choose Timely when

Choose TimeCamp when

Passive capture is the priority.

Hours must support billing, labor costs, and margins.

Dedicated capacity reporting is required.

Attendance, time off, and approvals belong in one workflow.

QuickBooks Online is sufficient.

The accounting stack includes Xero.

Leave is managed elsewhere.

User and project caps would restrict growth.

Screenshots must be unavailable.

A Linux desktop app is required.

One passive workflow is preferred.

Teams need rule-based and AI-assisted methods.

 

Use the checklist above as a final filter:

  • Timely centers on passive capture and capacity planning.
  • TimeCamp carries tracked hours further into billing and operational workflows.

Final verdict: which tool should you pick in 2026?

Timely turns background activity into reviewed timesheets and capacity views with minimal daily input. It is designed for teams that prioritize passive capture and resource planning without adding attendance, leave management, or an expanded accounting workflow to the same platform.

TimeCamp carries recorded hours into labor costs, expenses, approvals, attendance, time off, Xero, budgets, and invoicing. The actual monthly spend depends on the selected plan and AI token consumption, so the comparison should reflect the full workflow rather than the listed subscription price.

Both have the AI, but only TimeCamp has Xero, Linux, approvals, and a free plan.

Everything else is close. Set up a project, connect your accounting, and see whether those four make the difference for your team.

FAQ about TimeCamp and Timely

Is TimeCamp better than Timely for automatic time tracking?

These time tracking tools serve different workflows, so neither is universally better. Timely Memory and AutoSheet place passive capture and draft timesheets in one process. TimeCamp separates keyword-based assignment from AI-generated suggestions, then connects recorded hours with billing, attendance, approvals, and cost reporting.

Which is cheaper, TimeCamp or Timely?

TimeCamp has lower base subscription prices. With annual billing, its paid plans cost $3.99, $6.99, and $9.99 per user per month, compared with $9, $16, and $22 for Timely. AI Time Tracker usage adds a variable token-based cost, which can reduce the difference.

Does TimeCamp have an alternative to Timely Memory?

Yes, but it is not a one-to-one equivalent. The Standard Desktop App assigns activity through project keywords, and the AI Time Tracker prepares suggestions from recurring work patterns. Timely Memory and AutoSheet combine background capture and timesheet preparation in a single process.

Can TimeCamp and Timely track time without manual timers?

Yes. Timely Memory records computer activity and uses it to prepare draft entries for review, reducing the time management burden of reconstructing the day manually. TimeCamp either assigns activity through keyword rules or suggests entries based on work patterns. Manual time tracking remains available when users prefer to record hours directly. For a broader comparison of tools that record activity on Windows, see our screen time app for Windows ranking.

Does TimeCamp include attendance and time-off management?

Yes. TimeCamp Starter includes attendance records, overtime, vacation balances, and time-off requests. Timely records vacation and sick leave through administrative projects and tags rather than a dedicated leave-request module.

Do TimeCamp and Timely support invoicing and QuickBooks Online?

Yes, although the invoicing workflows differ. TimeCamp creates invoices and integrates natively with QuickBooks Online and Xero. Timely prepares invoice drafts that are sent and managed through QuickBooks Online on Premium and Unlimited.

Which tool offers more integrations?

TimeCamp connects natively with more categories of business software, including accounting, CRM, project management, development, and help desk platforms. Timely concentrates its most advanced synchronization features on selected tools; other connections provide context for Memory or run through APIs and Zapier.

Does TimeCamp detect idle time?

Yes. After a configurable period of inactivity, the desktop application records away time. Users can leave it as a break or assign it to a meeting, lunch, or offline work.

Are TimeCamp and Timely GDPR compliant?

Yes. Both platforms are GDPR-compliant and ISO 27001-certified. TimeCamp also provides private-cloud and self-hosted deployment options, including customer-selected AWS regions. Timely keeps its standard SaaS data in EU-based AWS infrastructure.

Does Timely take screenshots, and are screenshots required in TimeCamp?

No on both counts. Timely Memory does not record screenshots, keystrokes, or audio. TimeCamp offers screenshots as an optional feature, so teams can use automatic tracking, billing, attendance, profitability reporting, and approvals without enabling them.


Sources: 

https://www.timecamp.com
https://www.timecamp.com/pricing/
https://www.g2.com/products/timecamp/reviews
https://www.timely.com
https://www.timely.com/pricing
https://www.g2.com/products/timely-time-tracking/reviews